From Gas Supply
to Site Power.

Modular gas generation, connected with fuel infrastructure, battery storage and intelligent control for oilfields, mines, telecom and other weak-grid or remote sites.

Find answers for your project — customers, dealers & EPCs →

Source→System→Site power Integrated energy infrastructure · concept visualization
Configure for the site

Energy Solutions for Oilfields,
Mines and Remote Sites

Choose the closest site condition. The energy route below shows how CIMC ENRIC connects the right capabilities to the job.

Fuel-led system

Turn usable gas into on-site power.

Storage, gas conditioning and modular generation form the power route. BESS and EMS can steady output and support changing loads.

Fits: Oilfields · gas fields · industry · mining · data centers
Fuel Gas source
Prepare Store & condition
Generate AM600 / AM1200
Balance BESS + EMS
Load Site power
AM20 LNG power package positioned at the telecom project site for initial testing and deployment
PHOTO · INITIAL SITE DEPLOYMENT
Site testing begins Telecom energy
From delivery to field testing

AM20 on site.
Field testing begins.

The first AM20 package is now on site, beginning initial testing and deployment. LNG storage, gas preparation, controls and generation come together in one compact system. More units are planned to follow as the rollout progresses.

Power block 20 kW rated · 22 kW standby
Fuel path LNG storage to regulated gas
Design focus Uptime · fewer field visits
Project stage Site testing begins
See the AM20 site deployment →
One connected energy route

Integrated Gas-to-Power
System Design

We start with what the site can access, then connect the equipment, controls and delivery needed to turn it into reliable power. Each project uses the blocks its operating conditions call for.

01 · SOURCE

Energy available

Pipeline gas, LNG, CNG, associated gas, solar or biomass.

02 · PREPARE

Store & condition

Tanks, transport, vaporization, gas treatment and regulation.

03 · CONVERT

Generate power

Modular gas engines, CHP, renewable generation or grid supply.

04 · BALANCE

Store & control

BESS, PCS, EMS and CO₂ long-duration storage routes, matched to the project.

05 · DELIVER

Serve the load

Telecom, oilfields, mines, industry, data centers and remote sites.

Explore CO₂ long-duration energy storage →
CIMC EnTech · Energy infrastructure engineering

LNG infrastructure.
Engineered from the start.

From early-stage consultation to LNG terminal and cryogenic storage engineering, explore how CIMC EnTech can support your project.

Explore LNG infrastructure →
Europe · Southeast Asia · South America
Guangdong East LNG receiving station in China: aerial view of storage tanks, process area and jetty
Guangdong East LNG receiving station, China · EnTech reference: outbound transmission capacity expansion EPC.
AM Series · Modular gas power

Modular Gas Generators:
AM600, AM1200 and SL Series

Choose a single packaged unit for a focused site load, or build a larger power platform from modular AM blocks. Gas preparation and electrical interfaces are matched to the project.

AM600 600 kW · Single unit

Standard 20-ft high-cube. Plug-and-play.

A single high-cube package keeps the power block compact and straightforward to transport and deploy. A practical fit for oilfield, remote and distributed loads.

AM1200 1.2 MW · Modular block

More output in each block. Expand with multiple units.

Each 1.2 MW module uses four 300 kW generator modules. Group units to build larger plant capacity with a defined reserve, control and grid-interface plan.

SL1500 / 2000 SL Series · Long-duration

Large units for long-hour operation.

For sites that need large, long-duration generation, the SL series extends the product line beyond modular AM blocks. Fuel suitability, gas preparation, operating duty and electrical interfaces are assessed for each project.

View the SL2000-NG product →
Integrated as one site system Gas source & conditioning → AM generation → electrical interface & controls → BESS/EMS where the duty requires it → site load
Gas power equipment Manufacturing outlook · planning estimate
Up to 4 GW estimated annual equipment capacity

Estimated nameplate capacity of gas generation equipment that could be produced in a year. This is a planning estimate, not actual annual output, installed power capacity, current orders or electricity generated.

AM1200 details follow the published conceptual expansion page. Final configuration depends on confirmed fuel, load, grid and site data.

Strategic partnerships · project updates

Technology Partnerships for
Microgrids and LPG-to-Power

Explore the separate milestones of our SolaX and Firman initiatives for overseas mining microgrids and LPG-to-Power applications. Each partnership has its own development and agreement status.

SolaX × CIMC Cooperation signed

Mine microgrids, engineered as one system.

Strategic cooperation agreement signed. SolaX leads microgrid engineering and storage (BESS+PCS) integration with CIMC gas generation for overseas mines—an integrated energy architecture backed by a forthcoming white paper.

Overseas mining Microgrid + storage Gas generation
Read the partnership timeline →
Firman × CIMC MOU signed

LPG-to-Power for Africa’s off-grid loads.

A small-scale package designed for continuous 24-hour operation where LNG delivery is impractical. Firman’s local sales, operations and after-sales network can support deployment and lifecycle service, extending CIMC’s power solutions to more African use cases.

LPG availability 24-hour duty design Local service network
Read the MOU signing →

See each partnership page for its published milestones and confirmed scope. Operating performance depends on fuel quality, site conditions, configuration and maintenance.

Household & local energy partners

Household Energy.
Reliable power starts at home.

Industrial energy is our foundation. Homes and the small businesses around them are an important part of our next chapter.

With our strategic storage partner and Firman, we are developing household solutions that connect solar, battery storage and suitable LPG / LNG backup, supported by qualified local dealers.

Explore household energy solutions →
Strategic cooperation agreements signed

From the home to a local support network.

  • Energy system Solar + battery storage + suitable gas backup
  • Local ownership route Qualified dealers, installation and service
  • Financing roadmap Dealer and bank-supported instalments to develop
See the programme roadmap → Household configurations, country rollout and financing are planned stages.
CIMC Energy Storage · portfolio scale

CIMC Energy Storage
Manufacturing Network

Five domestic production bases support a broad portfolio for grid-scale, commercial and industrial, renewable integration, charging, marine and mobile applications. The new Baotou base extends the network into Northwest China.

DOMESTIC INDUSTRIAL NETWORK Five major production bases
01 CIMC 02 03 04 05
Five bases connected through CIMC Energy Storage and the container manufacturing network.
5 bases energy storage production network with Baotou now in operation
40+ GWh annual production capacity across the four established bases
15 GWh Baotou Phase I annual system delivery capability

The June 2025 four-base production-capacity reference and Baotou’s September 2026 Phase I delivery capability are shown separately; they are not a statement of current-year actual output. Read the manufacturing references →

NEW · SEPTEMBER 2026
Baotou, Inner Mongolia CIMC Northwest energy storage base now in operation · Phase II planned for completion in 2027
A broad product portfolio

Built for different power paths and operating environments.

Grid-scale Containerized battery systems
Commercial & industrial Cabinet and behind-the-meter systems
Power conversion PCS, inverter and transformer cabins
Special applications Marine, modular and mobile storage
One-stop delivery

From equipment design to operation, connected across the lifecycle.

01 R&D + simulation
02 Smart manufacturing
03 Testing + inspection
04 Global delivery
05 Smart operations
Explore BESS and microgrid capability
CIMC ENRIC · Physical energy storage

Long-Duration Storage.
A CO₂ Energy Route.

Store surplus electricity through CO₂ compression, liquid storage and recovered heat. Release it through reheating and expansion to generate power when demand returns.

Two-step CO2 storage guide. Charge: electricity compresses and cools CO2 into stored liquid, with heat recovered. Discharge: stored liquid is reheated for turbine generation; CO2 returns to the gas reservoir.
01 · CHARGE Electricity in
  1. 1
    CO₂ gas reservoir

    Ambient-pressure gas enters compression.

  2. 2
    Compress & cool

    Electricity drives compression; heat is recovered.

  3. 3
    Liquid CO₂ storage

    Store the liquid under pressure until discharge.

Thermal storageCompression heat is retained and reused for discharge.
02 · DISCHARGE Electricity out
  1. 4
    Reheat & evaporate

    Stored heat prepares CO₂ for expansion.

  2. 5
    Turbine + generator

    Expansion generates electricity.

↺ CO₂ returns to the gas reservoir for the next cycle.
Conceptual process · Detailed equipment and performance depend on project engineering.Download the process infographic ↓
4h+
Long-duration design route

For MW-scale projects where sustained discharge is part of the operating requirement.

01

Renewable energy shifting

Explore storing surplus wind or solar power for later demand and peak-shaving duties.

02

Above-ground storage

A gas-and-liquid storage route without an underground cavern. Land, safety distances and permits shape each design.

03

Gas equipment meets energy engineering

Built on Shijiazhuang ENRIC’s high-pressure gas equipment expertise, with system integration and delivery scope defined for each project.

Planning a long-duration storage project?

Bring your target MW / MWh, discharge hours, available land and grid or renewable profile. We can start by reviewing the technology route and equipment interfaces.

Discuss CO₂ storage
Above-ground air storage at the Three Gorges 10 MW CAES plant
Project referenceCompressed air storage

10 MW × 4 h compressed air storage. Performance tests complete.

CIMC ENRIC delivered the 10.5 MPa above-ground air storage system for China Three Gorges' CAES demonstration plant in Inner Mongolia. It uses standard pressure vessels, so no underground cavern is needed.

See the CAES project →
How does this fit with battery storage?

CO₂ storage adds a physical storage route to the portfolio alongside BESS. Selection depends on discharge duration, response requirements, footprint, cycling and project economics. The 4h+ marker describes a design application, rather than a guaranteed specification; capacity, efficiency, lifetime and cost are established during project engineering.

Explore BESS and microgrid solutions →
The complete site · Jiangmen modular data center capability

Modular Data Centers with
Integrated Power and Cooling

Power, storage, cooling and modular construction come together here. CIMC can coordinate the energy system around the data center, then connect it to factory-built infrastructure and site commissioning.

CIMC Digital Power modular data center system showing generator modules, PTU, cooling plant and data hall buildings
JIANGMEN · XINHUI Designed for factory integration and global delivery
CIMC Digital Power · published project references

The final proof is a whole site that works together.

At CIMC Digital Power’s Jiangmen Xinhui production base, modular data center buildings are engineered for factory manufacture and global project delivery. Combined project planning brings the power route, BESS and controls together with PTU, generator modules, prefabricated cooling plants, data hall modules and commissioning.

Power Grid, gas generation, PTU and reserve
Cooling Modular plants, piping skids and liquid-ready routes
Building Factory-built data hall modules
Delivery BIM, DFMA, assembly and commissioning
Explore data center and AIDC capability
52,000 Racks in published project references
17,000 Prefabricated modules supplied
540,000 m² Data center construction completed
Published CIMC Digital Power global project references. View the official references → · Manufacturing and delivery scope →
One delivery path

Energy source → AM generation → BESS + EMS → PTU + cooling → modular data halls → commissioning

Designed around the site

Find your way to work with CIMC

Your project. Your market.
Your cooperation point.

Whether you need an energy system, a local partnership or a platform for your own technology, choose the starting point that fits you.

Project owners & end users

Bring your site, fuel or grid conditions and power needs. Start a project assessment for the system that fits your operation.

Discuss your energy project →

Dealers & local partners

Bring your market, customers and service network. Explore equipment supply, local delivery and partnership opportunities.

Start a local-partner inquiry →

EPCs & engineering developers

Align the equipment scope, site interfaces and delivery plan. Tell us where your project needs manufacturing or integration support.

Discuss an engineering scope →

OEMs & technology partners

Bring your battery, engine, PCS, cooling technology or a new product idea. Explore the enclosure and system integration around it.

Bring your technology →
V-FAT / Manufacturing behind the solution

Explore the factory capability
behind your energy system.

From tanks and gas processing to generation, storage, cooling and modular data centers, follow the factory review routes that connect our energy capabilities to manufacturing and delivery evidence.

Explore the relevant CIMC entity, component suppliers and integration scope for your project.

CIMC storage production-facility reference
First showcase: energy storageFactory reference images, assembly and testing review points, and a brief to share with your project team.
Energy insights · Guides & field updates

Energy signals.
Practical project questions.

Explore regional developments, field notes and engineering routes that help customers, dealers and EPCs plan their next step.

Browse all energy insights →
Overseas Briefing

Household Energy Dealers: What to Prepare for Bank Financing

Prepare a household energy dealer financing discussion: equipment documents, bank requirements, repayment and T/T or L/C milestones. Includes a shareable checklist.

Read the article →
Overseas Briefing

Home Backup Power: LPG, Diesel or Battery — Start with Fuel Access

Compare LPG, diesel and battery backup for your home using fuel access, charging, essential loads and local service. Understand where LNG needs a separate assessment.

Read the article →
Overseas Briefing

Home Energy Systems: What Your Local Dealer Should Deliver

Know what a local home energy dealer should provide: site review, installation, commissioning, warranty and support. Explore the CIMC household delivery route.

Read the article →
Practical project questions

Gas-to-Power & Microgrid
Questions, Answered

Start with clear answers to common project questions, then explore the relevant product, solution or project reference.

What fuels can a modular gas-to-power system use?

Pipeline gas, LNG, CNG and suitable associated gas can supply a gas-to-power system. LNG and CNG need the appropriate storage and gas preparation equipment; engine selection depends on gas quality and supply conditions.

Read the full answer and related resources →
What does a 500 kW / 1.2 MWh BESS specification mean?

500 kW describes power; 1.2 MWh describes nominal stored energy. Dividing 1,200 kWh by 500 kW gives 2.4 hours in theory. Actual AC-side duration depends on usable energy, efficiency, auxiliary loads and operating limits.

Read the full answer and related resources →
What site work is required for an AM600 packaged generator?

The AM600 uses a single standard 20-ft high-cube package. Site preparation still includes foundations, unloading access, fuel connections, electrical interfaces, ventilation clearances and commissioning.

Read the full answer and related resources →
What is included in an initial project estimate?

An initial estimate should identify equipment, integration and project assumptions separately. Shipping, taxes, site work, installation, commissioning and fuel infrastructure must be explicitly included or excluded.

Read the full answer and related resources →
Take the next step

Start a Gas-to-Power or
Microgrid Project Assessment

Share four project details and continue to a first-pass assessment. The estimate supports early planning and is not a commercial quotation.

Average load starts at an editable 62% of peak on the calculator. Planning estimates depend on site data and final engineering review.
CIMC ENRIC · PROJECT TOOL

Gas-to-Power Feasibility Calculator

Estimate CNG, LNG or pipeline-gas demand and avoided operating cost for your project.

Open calculator →