Smarter Energy Solutions for Mining Operations.
Lower costs. Higher reliability. Greener future. CIMC ENRIC helps mines choose the right power route for their site condition: diesel + BESS, grid + PV + BESS, or natural gas generation.
Reduce costs
Save fuel by adding industrial BESS to diesel gensets, or reduce purchased electricity through PV, BESS and smart EMS dispatch.
Enhance reliability
Stabilize critical mine loads with modular generation, storage, switchgear, PCS/EMS and remote monitoring.
Lower emissions
Replace inefficient diesel operation with cleaner gas generation, renewable hybrid supply and optimized energy storage.
Three mine-site routes in one picture.
This image is the right entry point for mining customers because it covers diesel sites, grid-connected mines and gas-available mines without forcing every project into a natural-gas-only story.
Use this as the visual anchor before the detailed route cards: existing diesel gensets, grid + PV + BESS, and natural gas generation.
Choose the optimal solution for your mine site conditions.
Mining projects rarely start from the same energy base. The first decision is simple: do you mainly have diesel gensets, grid access or usable gas?
Existing diesel gensets? Add BESS, save more fuel.
Connect industrial-grade BESS on the load side to reduce spinning reserve, absorb load swings and keep diesel gensets operating near their golden load range.
- Optimize genset operation around 70-85% load.
- Cut diesel fuel consumption by 30%+ in suitable duty cycles.
- Reduce maintenance and extend equipment life.
- Improve power quality for crushing, hoisting, pumping and camp loads.
Have grid power? Go hybrid, pay less.
CIMC ENRIC coordinates PV, PCS/EMS and BESS into a one-stop hybrid power system that lowers purchased energy cost and protects the mine from unstable grid conditions.
- Peak shaving and load shifting for demand charge control.
- Use PV generation to reduce grid draw during daytime operations.
- Integrate BESS, PCS, EMS, E-house and switchgear.
- Plan staged expansion as mining load grows.
Have natural gas? Generate smarter with a modular gas route.
Use a high-performance natural gas generator set as the primary power source, backed by storage and smart controls where needed, for reliable and cleaner on-site generation.
- High efficiency with lower fuel consumption and lower emissions.
- Reliable and durable for harsh mining environments.
- Modular design for fast installation and capacity expansion.
- Suitable for natural gas, associated gas or other qualified gas routes after pre-engineering.
Gas generation module option for gas-available mines
A modular gas power block for mines that can access natural gas, associated gas, coalbed methane or similar qualified fuels. It provides a practical bridge from fuel resource to stable electricity at the mine site.
G-drive engine
High efficiency and low emissions for mining power duty.
Rugged and reliable
Designed for demanding site conditions and long operating hours.
Easy maintenance
Long service intervals with global support and spare parts planning.
For gas-available mines, start with the gas source and load profile.
This is the right place for the gas genset requirements form: inside the mining natural-gas route, and linked again from Contact or Project Calculator when the customer selects gas as the available energy source.
From early calculation to integrated site delivery.
CIMC ENRIC brings the equipment chain and engineering chain together: gas gensets, BESS, PCS/EMS, PV, E-house, switchgear, modular buildings, monitoring and lifecycle service.
Questions mine operators ask before sizing the system.
When should a mine add BESS to diesel generators?
When diesel fuel cost is high, load swings are large, generator idling is common or reserve capacity is expensive, BESS can reduce fuel use, stabilize voltage/frequency and cut maintenance pressure.
What changes if the mine already has grid power?
The project focus shifts to PV + BESS + PCS/EMS integration, demand charge reduction, load shifting, backup capability and planned expansion for new mining loads.
What makes a mine ready for modular gas generation?
The site should have a usable gas route and enough gas data for pre-engineering: fuel type, gas composition, LHV, flow, pressure, pressure fluctuation, impurities and operating load profile.
Send us the mine site condition. We will map the route.
Whether your starting point is diesel, grid power or gas, CIMC ENRIC can prepare a scenario-based concept for power reliability, operating cost and expansion planning.